墻面快裝板怎樣安裝?
來(lái)源:http://0473114.cn/ 日期:2021-12-13 發(fā)布人:admin
墻面快裝板安裝步驟一:
Installation step I of wall quick mounting plate:
拼縫處應(yīng)裝有密封膠,在完成前一道工序后,將被下一道工序覆蓋。
The joint shall be equipped with sealant, which will be covered by the next process after the previous process is completed.
墻面快裝板安裝步驟二:
Installation step 2 of wall quick mounting plate:
金屬面夾芯板墻板的豎縫應(yīng)采用槽形縫或工字形鋁縫。“隱蔽工程”可分為水上安裝,甚至可能危害人身安全??蚣軕?yīng)與橫梁連接,上部隔板,外墻板和門窗框應(yīng)連接;然后應(yīng)安裝樓板檁條,外面板應(yīng)向下重疊。實(shí)際上,這種輕鋼結(jié)構(gòu)用于平整圍墻和隔斷墻的基礎(chǔ),更好地使用鋼筋混凝土,安裝樓梯,鋪地板,然后向上安裝一層,然后安裝屋頂桁架和屋頂面板。
The vertical joint of metal faced sandwich panel wall panel shall adopt slot joint or I-shaped aluminum joint. "Concealed works" can be divided into water installation, which may even endanger personal safety. The frame shall be connected with the beam, and the upper partition, outer wall panel and door and window frame shall be connected; The floor purlins shall then be installed and the outer panels shall overlap downward. In fact, this light steel structure is used to level the foundation of the enclosure and partition wall, make better use of reinforced concrete, install stairs, lay the floor, then install one floor upward, and then install the roof truss and roof panel.
墻面快裝板安裝步驟三:
Installation step 3 of wall quick mounting plate:
安裝門窗等,拉豎向支撐。還有就是衛(wèi)生潔具啊、小五金之類的,嵌入式墻板的上下搭接縫應(yīng)采用企口縫、電安裝及防潮、防水等項(xiàng)目。其中的每一個(gè)項(xiàng)目都不容忽視,如果哪一個(gè)環(huán)節(jié)出了問(wèn)題,都可能帶來(lái)嚴(yán)重的經(jīng)濟(jì)損失,表面裝飾得再漂亮,也是徒勞;然后立柱子、墻梁或樓面次桁架的連接應(yīng)使用螺栓連接。連接螺栓橫向間距應(yīng)不大于500mm(每塊板寬度方向設(shè)置不少于兩個(gè)螺栓)。
Install doors and windows and pull vertical support. There are sanitary ware, hardware and so on. The upper and lower lap joints of embedded wallboards should adopt tongue and groove joints, electrical installation, moisture-proof, waterproof and other items. Every project can not be ignored. If any link goes wrong, it may bring serious economic losses. No matter how beautiful the surface decoration is, it is futile; Then, the connection of vertical columns, wall beams or floor sub trusses shall be bolted. The transverse spacing of connecting bolts shall not be greater than 500mm (no less than two bolts shall be set in the width direction of each plate).
墻面快裝板安裝步驟四:
Installation step 4 of wall quick mounting plate:
嵌入式墻板安裝應(yīng)在冷彎薄壁型鋼結(jié)構(gòu)安裝時(shí)及時(shí)鑲?cè)酥觾蓚?cè)槽內(nèi)。
The embedded wallboard shall be inserted into the grooves on both sides of the column in time during the installation of cold-formed thin-walled steel structure.
以上的精彩內(nèi)容來(lái)自:濟(jì)南創(chuàng)圖貿(mào)易有限公司富美家快裝板的介紹及分享,更多內(nèi)容請(qǐng)繼續(xù)關(guān)注我們:http://0473114.cn
The above wonderful content comes from the introduction and sharing of fumeijia Express board of Jinan chuangtu Trading Co., Ltd. please continue to pay attention to us for more content: http://0473114.cn